XINHANGXINHANG STEEL FORMWORK
中文Enquire
Home / Sinohydro Bureau 16 · Beibu Gulf Water Resources Allocation

WATER INFRASTRUCTURE

Sinohydro Bureau 16 · Beibu Gulf Water Resources Allocation

Hydraulic tunnel lining trolley and gate shaft formwork

Sinohydro Bureau 16 · Beibu Gulf Water Resources Allocation

Project reference

PROJECT APPLICATION

Formwork on the job site

Steel formwork products and fabrication coordination for the project’s structural requirements. The application scope is outlined below.

Project
Sinohydro Bureau 16 · Beibu Gulf Water Resources Allocation
Sector
WATER INFRASTRUCTURE
Scope
Hydraulic tunnel lining trolley and gate shaft formwork
Discuss a similar project

Project information supplied by Xinhang.

LET’S BUILD TOGETHER

From your drawings. To the job site.

Discuss your project